Construction Management / Supervision Measures Theodor-Heuss Bridge
Landeshauptstadt Düsseldorf, Der Oberbürgermeister, Amt für Recht, Vergabe und Versicherungen, Zentrale Vergabestelle
Notice summary
Construction management / supervision measures for the construction lots 1 'Cantilever Strengthening' and 2 'Railing Height Increase' at the Theodor-Heuss Bridge. The reinforced concrete ribbed slabs on the cantilevers of the river bridge are to be replaced with orthotropic steel plates. On the approach bridges, the existing railings are to be increased to 1.30 m. In addition to the local construction management / supervision task, the monitoring of factory and assembly for s…
Is this worth bidding on?
Tender Radar scores every tender against your company profile, surfaces the matching services, and flags the ones worth your time — across Europe and beyond. Sign in to see the relevance match and full AI analysis for this opportunity.