EOP· BulgariatenderOpen · 19 Oct 2026
Selection of a contractor for the execution of construction and installation works on the project: 'Reconstruction of the water supply network on Hristo Botev St., Bratya Krastini St., Malina Todorova St., and Prof. Dr. Vasil Tashev St.: SECOND STAGE: 'Reconstruction of the water supply network on Bratya Krastini St., Hristo Botev St., and Prof. Dr. Vasil Tashev St.'
ОБЩИНА РАКИТОВО
Deadline 19 Oct 2026Deadline19 Oct 2026
Estimated value€294,397
CPV category45232150
Published28 Sep 2026
Referenceeop:ocds-e82gsb-609753
Notice summary
Continuation from section Description (BT-24-Procedure): The existing water supply on Bratya Krastini St. in the section between Lipa St. and Alexander Stambolijski St. is executed from f200 /AC/ /which plays the role of the main water supply/ and from f100 steel /to which the building water supply branches are connected to the properties in this section of the street/. Considering that there are two water supply systems in the section and in order to preserve the main charac…
Is this worth bidding on?
Tender Radar scores every tender against your company profile, surfaces the matching services, and flags the ones worth your time — across Europe and beyond. Sign in to see the relevance match and full AI analysis for this opportunity.